Ginninderra Drive Extension is 20 m away from the dam and is now fully open with vehicles travelling at 80km/hr. It cuts this dam off from neighbouring dams lower down the hill, but then the old Caswell Dr did too. Water is down campared with level on Monday.; Size: 12 m�;
1,900,751 sightings of 21,152 species in 9,355 locations from 13,000 contributors CCA 3.0 | privacy
We acknowledge the Traditional Owners of this land and acknowledge their continuing connection to their culture. We pay our respects to their Elders past and present.